Stuart Piling supplied and installed 152 9m GU16 sheet piles, 2nr hydraulic bracing frames and excavated to 6m to allow Mid Glamorgan Construction to form a press pit
We pre augered and installed the sheet piles with the Movax Piling Rig and 25m vibro
Value – £150,000 + vat